Sunday, July 05, 2009

Almost done

One more coat on the stairs, one more accent wall in a bedroom, and a few touch-ups. That's it. Time to paint a 1200 square foot 2 level - 8 days, assuming we get one last coat on tomorrow.

In addition, we have de-junked and moved all our bookshelves to the basement, where we hope to find them permanent homes.

Also, as a special treat, and in lieu of using my bonus money to upgrade our Hyundai to something with lower miles, we picked up a new mattress. I don't know if it is comfortable yet, because every time I lay down on it, I immediately lose consciousness.

On the beer side, my new kegged pale ale is drinking a treat, and I hope to have the Trippel and a Municher Dunkel in kegs by the end of the week.

Tomorrow, our plans get even more interesting. After work, I am picking up our flooring, about 850 square feet of decent laminate, along with underlayment and perhaps stair nosing. I will also need to get some 1/2 inch plywood subfloor for a small part of the downstairs where there is not already additional subfloor. The good news is that our floor in the kitchen and hall already meet code for tile. Woo hoo.

Oh, yes, the tile. about 250 square feet of it, but that is going in last, as it will be the most disruptive, essentially keeping us out of our kitchen and front hall for quite some time. I am also considering a tile backspash in the kitchen, but really only if I don't need to put up any serious kind of backer-board. I dunno. And then the tile for the countertops............

Oh dear. I seem to have the bug.....

No comments: