Here's the update: since Monday afternoon we have done the following:

Painted the upstairs back bedroom (Royal Purple) (the one with the walk-in closet) - 4 coats - finished for paint but for a few touch-ups

Painted the upstairs bathroom (Chocolate brown) 2 coats and touch ups - finished.

Painted upstairs hallway (awesome blue - hints of black/grey) 1.5 coats (some places have two) Will need 1.5 more for a total of 3, will be finished tomorrow.

Our bedroom - one wall the colour of the hallway - will need 3.

Bought 360 LF of 3/4*3 1/2 baseboards on massive sale and moved them home in my Hyundai. It took two trips, one crushed finger, and a lot of shouting.

Still to come:

Other back bedroom - probably 3 coats.

Stairs and downstairs - 2-3 coats depending on colour.

That will be it for painting.

And then:

800 SQFT of laminate floor in the upstairs and half the downstairs.

300 SQFT ceramic tile in the Front half of the downstairs and the upstairs bathroom.

So we gots our summer planned.

Pictures to follow.